Executive summary: This document reports on the risks identified during field operations carried out in the second year of the PACIFIC project, from June 2019 to June 2020. During this period, two surveys were carried out at the Kallak iron ore project in Sweden and another was conducted at the Kaiserstuhl site in Germany.
The document builds on D5.2 - Environmental and Safety Risk Database adopted in 2018, and D5.3 Annual Risk Management Report 1. The procedures outlined in these documents were implemented during the surveys. No injuries were reported in either survey and impact on the local environment was found to be minimal.