...statements, followed by an open discussion with the members of the...audience allowing for a targeted discussion on a topical policy issue.&nb...17:10 – 18:00
Paneldiscussion with Keynote Speakers...” (including an open discussion with the members of the audie...
...ue in September this year by a paneldiscussion with policy makers, and...re concretely, this would be a paneldiscussion with regional industry repres...deas about 2-3 additional panellists, and we kindly ask you to thi...suit and complement the paneldiscussion....
Tags: PanelDiscussion, FLEXTURBINE, Turbomachine, Prague, Flexible Fossil Power Plant, ASI, CTU, Policy makers and MEPs-MPs at European and Member State level, DSWP, ARTTIC
Brief description: Executive summary: The passive seismic survey of the Kaiserstuhl test site was initiated during discussion between partners of the PACIF...
Brief description: Executive Summary: The passive seismic survey of the La Cruces mine site was initiated during discussion between partners of the PACIF...
In the last weeks, the Coordinator DSPW and ARTTIC have discussed the possibility to “extend” the FLEXTURBINE Conference in Prague in September this year by a panel discussion with policy makers, and we have made some progress on this. A “side-event” upfront the conference...
Tags: Panel Discussion, FLEXTURBINE, Turbomachine, Prague, Flexible Fossil Power Plant, ASI, CTU, Policy makers and MEPs-MPs at European and Member State level, DSWP, ARTTIC